So last Saturday 12/14 I had a little longer than twenty minutes to knit. That’s probably a good thing because so far this week there has not been a lot of knitting…
There’s been CLEANING because of mold. Yup. MOLD!!! No, not black mold… so maybe it was mildew – but YECH! Clorox bleach to the rescue (and breaks).
I am using two balls of Cascade Eco Duo which has subtle color changes. By going back and forth between the two I make a more drastic, and less deep set of stripes.
Shown below are 12/12/13 progress (left) 12/16/13 photo 23 minutes before midnight (right) and 12/17 8 minutes after midnight.
So a bit more than twenty minutes… but I was checking to see if the sink was draining… Yes… frozen pipe. (bottom)



